11, Jalan Bazar U8/99,
+603-5031 5257
Planning and Designing of the following: Hydraulic Design: Determine sump capacity, flow rates, and dimensions based on pumping requirements. Structural Design: Design the sump structure to handle fluid pressure, soil loads, and operational stresses. Material Selection: Choose appropriate materials (e.g., concrete, reinforcement steel, waterproofing materials) based on environmental conditions and fluid type. Approvals: Obtain necessary
Read MoreSite Preparation which include: Surveying: Conduct site surveys and mark boundaries for the sump. Excavation: Excavate the site to the required depth and dimensions. Dewatering: Remove groundwater using pumps if excavation is below the water table. Soil Stabilization: Stabilize the soil if needed to ensure structural safety.
Read MoreFoundation Work including: Base Preparation: Compact the soil and lay a blinding layer (e.g., lean concrete) to create a stable base. Reinforcement Placement: Install reinforcement steel for the base slab as per design specifications. Concrete Pouring: Pour and cure the foundation concrete to provide a solid base for the sump.
Read MoreWall and Floor Construction including: Formwork Installation: Set up formwork for sump walls and the floor to achieve the required shapes and dimensions. Reinforcement Placement: Place reinforcement steel for walls and the floor to strengthen the structure. Concrete Pouring and Curing: Pour concrete for walls and the floor in stages, ensuring proper curing to enhance
Read MoreInternal Features incuding: Guide Vanes: Install guide vanes or baffles to manage fluid flow and prevent vortices. Suction Bells: Prepare provisions for suction pipes or suction bells as per the pump’s design. Anti-Floating Measures: Incorporate measures (e.g., anchoring) to prevent flotation if the sump is located in a high groundwater table area.
Read MoreWater Proofing including: Surface Treatment: Apply waterproof coatings or membranes to prevent leakage. Joint Sealing: Seal all construction joints using water stops or other sealing materials.
Read MorePump installation including: Anchor Plates: Fix anchor bolts or plates to secure pump bases. Pipeline Integration: Connect suction and discharge pipelines to the sump as per design. Access Features: Install ladders, platforms, or manholes for maintenance access.
Read MoreTesting and Commissioning including: Structural Testing: Check for structural integrity (e.g., load testing, water retention testing). Hydraulic Testing: Test the flow dynamics to ensure proper functioning of the sump and pump system. Electrical Testing: Verify electrical connections, control systems, and pump operations.
Read MoreDut perspiciatis unde omnis iste natus error sit voluptatems accusantium doloremqu laudantiums ut, totams se aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae duis autems vell eums iriure dolors in hendrerit saep. Eveniet in vulputate velit esse molestie consequat, vel illum dolore eu feugiat nulla facilisis at seds eros sed et
Read More